Skip to content
Sprint projectOct 24, 2026

Take Away the Means: a Proved Capacity Cap on Covert Signalling between Procurement Agents

Tony Gair · Team The Dark Factory

Submitted to AI Collusion Research Sprint. Sprint projects are early-stage work by participants, not Apart Research publications.

Read the report

Report: Take Away the Means: a Proved Capacity Cap on Covert Signalling between Procurement Agents

Code (opens in new tab)
Share

Two LLM agents, one ordering stock and one supplying it, try to pass a 24-bit secret while still doing the job. Most defences watch the conversation and give you a detection rate, so something always gets through. Every message has to be a form, an item from 1 to 8 and a quantity from 0 to 3, or nothing. A chain of proofs in SPARK Ada, made by our own software factory, rewrites each message into a fixed line, so the sender's own words never reach the other agent. A capacity proof made in the sprint shows there are exactly 33 possible lines, so four messages carry at most 20.2 bits. Even with a perfect codebook a whole secret gets through at most about 1 time in 14 (7.07%), whatever the model does. With gpt-oss:120b colluding on plans written by Claude Opus, free text with no defence leaked the whole secret in 26/30, 22/30 and 11/30 episodes (seeds 1–3). Through the gate it was 0/90, with the order right in 97–100% of episodes. The leftover leak, 0.93–1.13 digits above chance, sits just under the 4.585 bits of item order the proof allows. An attacker who knew the gate reached the cap. Kimi and DeepSeek judges let 1.03–3.59 digits past, depending on the plan. A heuristic filter blocked only typography, and on one seed whole secrets got past it in 16/30 episodes. The cap counts message order and silence but does not remove them; shared knowledge is outside the proof.

Reviews

Judging this Sprint?

Review “Take Away the Means: a Proved Capacity Cap on Covert Signalling between Procurement Agents”

Your public critique appears on the project page without your name. Reviews of strong projects are shared with funders, as you choose below.

Not shown on the project page.

Shown on the project page, without your name.

Only the Apart team reads this, and funders if you agree below.

Decline to score

Only when the quality of the writing makes the work impossible to follow. Say why in your private critique; the project page shows only that a judge declined, not why.

How much would this matter for the field if it worked? How innovative is it? For scores of 4-5: is this actually new to the field, or replicating recent work?

Scoring guide
  1. 1Negligible. No clear problem addressed, or no meaningful novelty.
  2. 2Limited. Addresses a real problem but with a generic or well-trodden approach. Incremental at best.
  3. 3Moderate. Clear problem with a reasonable approach; some novelty in framing or method beyond routine application of existing tools.
  4. 4Significant. Important problem with an original approach, or identifies a neglected problem area. A valuable contribution others could build on.
  5. 5Exceptional. Tackles a critical problem with a genuinely novel approach, or opens a new research direction. Clear theory of change. You'd be excited to share this with researchers in the area.

How sound are methodology, implementation, and findings?

Scoring guide
  1. 1Seriously flawed. Methodology broken, results uninterpretable, or implementation doesn't work.
  2. 2Weak. Approach has significant gaps: missing validation, flawed experimental design, or incomplete implementation.
  3. 3Competent. Technically solid given the short duration. Methodology makes sense, results are interpretable, limitations acknowledged, work builds toward clear conclusions.
  4. 4Strong. Thorough methodology with convincing validation. Results clearly support conclusions. Immediately useful for future work.
  5. 5Exceptional. Ambitious scope executed rigorously. Surprising findings, novel methods, or unusually robust validation.

How clearly are work, findings, and impact potential communicated?

Scoring guide
  1. 1Incomprehensible. Cannot determine what the project is actually claiming or doing.
  2. 2Hard to follow. Key information buried, missing, or diluted by excessive length. Significant effort to extract main points.
  3. 3Clear enough. Can understand the problem, approach, and results without undue effort. Core content clearly present: problem, method, findings, limitations.
  4. 4Well presented. Easy to follow, well-structured, appropriate level of detail. Target audience would get it quickly.
  5. 5Exceptionally clear. A pleasure to read. Complex ideas made accessible. Could serve as a model for how to present this type of work.
Sharing your name *

When we share a strong project with funders, your name, scores and public critique go with it, confidentially; this choice is only about whether your name is public. If you think this project deserves funding, please also endorse it: that carries the most weight.

Share my private critique with funders *

See our Privacy Policy.

No public critique yet.

Cite this project

@misc{gair2026take,
  title = {{Take Away the Means: a Proved Capacity Cap on Covert Signalling between Procurement Agents}},
  author = {Tony Gair},
  year = {2026},
  month = oct,
  note = {Submitted to AI Collusion Research Sprint, an Apart Research Sprint},
  howpublished = {\url{https://apartresearch.com/sprints/projects/take-away-the-means-a-proved-capacity-cap-on-covert-signalling-between-procurement-agents-9n9f}},
  url = {https://apartresearch.com/sprints/projects/take-away-the-means-a-proved-capacity-cap-on-covert-signalling-between-procurement-agents-9n9f}
}